Friday, December 18, 2009

December 18th - Section 3: Build-Up and Finalize

Design Step 3: Build-Up and Finalize
6 Unit Bridge & 4 Single Copings with Vacuum Formed Template

Once the frameworks are created, the final step is to add support and properly shape them by using the virtual wax knife. The amplitude and radius of the can be adjusted to add proper support or remove for more porcealin clearance.

Measurements can be taken by using several methods to ensure proper clearance as well as support.

The suckdown is used to ensure proper alignment of the framework and to check cusp height.


No comments:

Post a Comment